Chainpur Seti Hydroelectric Project

Hydropower
Civil Works

Chainpur Seti Hydroelectric Project (CSHEP) is Peaking Run off River type Hydropower project being developed in Seti River that is located in Saipal, Talkot and Mastha Rural-Municipality in the Bajhang District of Sudurpaschim Province.

Overview

Type of Development Peaking Run-of-River (PRoR)
Location Saipal, Talkot and Mastha Rural-Municipality in the Bajhang District of Sudurpaschim Province
Maximum Output 210 MW
Annual Energy 1133.72 GWh
Design Discharge
Power House
Number of units 3
Construction Cost
Construction Time Period